ADU Plans in Carmel-by-the-Sea, CA

Backyard cottages, garage and studio conversions and junior units on Carmel’s small, tree-lined lots, drawn to the rules the City applies today, with the water and coastal questions answered first.

Quick version: Carmel-by-the-Sea has no updated ADU ordinance yet, so the City handles ADUs under state ADU law, alongside its certified Local Coastal Program. On a one-square-mile village of small lots, the questions that decide an ADU are how much floor area the lot has left, where the water comes from, and which trees are in the way. We answer those first, then draw the unit and file it with the City. Call 805-712-8993.

How Carmel handles an ADU today

The City’s long-range planning page says Carmel is drafting a local ordinance and that, in the interim, ADUs and junior ADUs are permitted and must comply with state law. The Planning Commission held workshops on draft ordinances in November 2023, November 2024 and September 25, 2025, and the City Council held an ADU policy discussion on August 4, 2026 (agendas and recordings are on the City’s meeting portal).

  • State law sets the floor. City staff told the Council that applications have been processed under the state ADU statutes after the City’s 2017 ordinance was overtaken by later state laws. The State ADU Handbook explains those statutes.
  • The coastal program still applies. Staff’s takeaway was that state law (Government Code 66329) preserves the Coastal Act, so the City’s certified Local Coastal Program limits on floor area, setbacks, tree protection and historic preservation continue to apply where they protect coastal resources.
  • The rules are moving. The Council asked staff to keep working on an updated ordinance and coastal program changes. We check the current approach with Community Planning and Building (831-620-2010, planning@ci.carmel.ca.us) for each lot before design.

Size, height and setbacks from the City’s guide

The City’s ADU starter guide for property owners (November 7, 2024) summarizes the current state limits as the City applies them:

  • Detached ADU: up to 850 square feet with one bedroom, or 1,000 square feet with two.
  • Attached ADU: up to 50 percent of the living area or 800 square feet.
  • Junior ADU: up to 500 square feet, fully inside the walls of the house, with an efficiency kitchen and its own exterior entry.
  • Height: 16 feet for a detached ADU up to 800 square feet with 4-foot side and rear setbacks; up to 24 feet when attached to the house.
  • Setbacks: 4 feet from side and rear lines; a conversion of an existing structure can keep its existing setbacks.
  • Parking: none required for an ADU or junior ADU.
  • Timing: a detached ADU under 800 square feet, no taller than 16 feet, with 4-foot side and rear setbacks, can be permitted within 60 days.
  • Sprinklers and solar: sprinklers only if the house has or needs them; solar-ready infrastructure for new detached ADUs.
  • Use: no rentals under 30 days in residential neighborhoods, no separate sale, and owner occupancy of one unit when there is a junior ADU.

The guide also notes that exterior changes go to the Planning Division. On a typical Carmel lot, the 800 square foot unit with 4-foot setbacks and a 16-foot roof is the most predictable path, because state law protects that unit size. Bigger units run into the floor area the coastal program allows on the lot, which counts the house and the ADU together.

Converting a garage, studio or guesthouse

Many Carmel homes already have a detached garage, studio or guesthouse, and the City’s guide calls conversion a more affordable way to add an ADU. An existing bath in a studio or guesthouse may already carry water credits and plumbing, and a utility sink in a garage counts toward the water an ADU needs. Units converted from existing square footage are not treated as new dwellings for water, sewer or power, so the utility providers cannot charge connection charges for them. Before drawing a conversion, we confirm the structure was permitted, because the City keeps old ADU categories (Class I and Class II units) that were legalized decades ago.

Water: the first question in Carmel

The City’s planning page asks owners to contact the Monterey Peninsula Water Management District first, to make sure the property has water for the unit’s kitchen and bath. The district’s ADU page and water permit rules explain how fixtures are counted. The City’s guide lays out the approach:

  • fill out the district’s Residential Water Release Form to count existing fixtures and the water the ADU needs (the district can also tell you if a water permit is on file: 831-658-5601);
  • swap older fixtures for efficient ones to free up water credits, which the guide calls harvesting water credits;
  • plan the unit on the property’s existing service, because a regional moratorium limits new meters and new water credits are scarce.

The moratorium comes from the State Water Board’s cease and desist order on Cal Am. The district’s CDO update tracks the State Water Board process, with a public comment day on November 5, 2026 and closing briefs due November 10. Until that changes, we size the ADU to the water the lot has.

Coastal zone, trees and village character

Carmel’s Local Coastal Program covers the village, and state law has the City approve or deny an ADU coastal permit within 60 days of a complete application, alongside the ADU permit and without a required public hearing. The Coastal Commission’s ADU guidance memo adds that a junior ADU inside the existing house generally is not development under the Coastal Act.

  • Trees: Carmel’s urban forest is part of the coastal program, and City staff listed tree protection among the rules that continue to apply. We locate trunks and driplines on the site plan and place the unit and its footings around them.
  • Historic homes: historic preservation also stays in force. If the house is on the City’s historic inventory, we favor a detached unit or an interior junior ADU that leaves the historic exterior alone.
  • Village character: the City’s guide asks owners to think about placement, views, privacy, landscape, and matching the house’s style, materials and colors. We draw the unit to read as part of the property.

How the permit goes in

  1. Water first: the district’s Water Release Form and fixture count.
  2. Feasibility: we check the lot’s remaining floor area, setbacks, trees, the existing structures’ permits and whether the house is historic, then confirm the review path with Community Planning and Building.
  3. Plans: site plan, floor plans, elevations and sections, structural sheets from a licensed engineer, Title 24 energy and solar-ready items, and the fixture schedule.
  4. Submittal: the building permit application to the City’s Building Safety Division, filed online through the City’s permit portal, with the City’s attached or detached ADU submittal checklist.
  5. Corrections and issuance: plan check comments, the water permit, then construction and a Certificate of Occupancy.

The City’s guide counts 30 ADUs completed in Carmel from 2018 and 22 more under construction as of November 2024, so this is a well-worn path even under changing rules.

Who draws the plans

Harrod Drafting & Design is a Paso Robles drafting and design office. The plan sets on our portfolio are homes in North San Luis Obispo County; we have none to show in Carmel-by-the-Sea yet. To judge the drawings, see our portfolio or our sheet-by-sheet permit set guide. State law (Business and Professions Code 5537) allows a building designer to prepare plans for wood-frame dwellings of two stories or less plus a basement, which covers an ADU; a licensed engineer designs and stamps the structure, and we bring in a surveyor, arborist or other consultant when the lot calls for one.

Carmel ADU questions

Does Carmel-by-the-Sea have its own ADU ordinance?

Not an updated one. The City’s planning page says it is drafting a local ordinance and that, in the meantime, ADUs and junior ADUs are permitted under state law. City staff told the Council on August 4, 2026 that applications have been processed under the state statutes, while the City’s certified Local Coastal Program still governs things like floor area, setbacks, trees and historic resources. We confirm with Community Planning and Building how a specific lot will be handled before we draw.

How big can an ADU be in Carmel?

The City’s ADU starter guide lists the current state limits: a detached ADU up to 850 square feet with one bedroom or 1,000 square feet with two, an attached ADU up to 50 percent of the living area or 800 square feet, and a junior ADU up to 500 square feet inside the house. Because Carmel lots are small and the coastal program limits floor area, the real limit on many lots is how much floor area the site has left.

How tall can a detached ADU be in Carmel, and how close to the lot line?

The City’s guide lists 16 feet for a detached ADU up to 800 square feet with 4-foot side and rear setbacks, and up to 24 feet for an ADU attached to the house. A conversion of an existing structure can keep its existing setbacks. The guide notes that a detached unit of that size, height and setback can be permitted within 60 days.

Where does the water for a Carmel ADU come from?

From the water the property already has. Carmel is in the Monterey Peninsula Water Management District, and the City’s guide says to start with the district’s Residential Water Release Form to count existing fixtures and the water the ADU needs. Older fixtures can be swapped for efficient ones to free up water credits, and an existing bath in a studio or a utility sink in a garage counts. New meters are limited by the regional moratorium.

Does a Carmel ADU need parking?

The City’s guide lists no parking requirement for an ADU or a junior ADU.

Can I rent out a Carmel ADU on a short-term basis?

No. The City’s guide says rentals of less than 30 days are not allowed in Carmel’s residential neighborhoods. Renting is optional, an ADU cannot be sold separately from the house, and with a junior ADU the owner must live in one of the units.

Related: our Carmel-by-the-Sea design and drafting overview, remodel plans in Carmel, new home plans in Carmel, and the nearby ADU guides for Carmel Valley, Pacific Grove, the City of Monterey, Seaside, Marina and unincorporated Monterey County.

Ready to start the ADU?

We design with real construction costs in mind, and our sister company Harrod Built can give you costing as the design comes together and build it when your Carmel-by-the-Sea ADU plans are approved. Same family, same office.

Get a quote for ADU plans in Carmel-by-the-Sea

Call 805-712-8993 or use the form. It helps to include the address or parcel number, the lot size, any garage or studio you want to convert, the trees near the spot you have in mind, what you know about the property’s water, and the unit size you want. Our contact page lists other ways to reach us.











    Sources for this page: the City of Carmel-by-the-Sea’s ADU starter guide (November 7, 2024), long-range planning page and August 4, 2026 City Council ADU policy discussion; the Monterey Peninsula Water Management District’s ADU, water permit and cease and desist order pages; the Coastal Commission’s ADU guidance memo; and the State HCD ADU Handbook (checked October 23, 2026). Carmel’s ADU rules are under revision, so we confirm each item with the City and the water district for every parcel before design.