
Home Design & Drafting in Carmel Highlands
New homes, remodels, additions and ADUs on the steep coastal lots south of Carmel, drawn for Monterey County coastal review.
Carmel Highlands is unincorporated Monterey County, on the coast along Highway 1 south of Carmel. Lots here are often steep, wooded and close to the ocean, and nearly everything is in the coastal zone. That means a new house or a large addition usually involves several County permits at once, plus fire district conditions and, depending on the parcel, sewer and water approvals. We draw the plans with that whole list in front of us.
Design and drafting services for Highlands owners
- Custom homes and rebuilds on sloped and bluff-top lots, with the site plan, grading and access drawn early.
- Additions and remodels, sized with the County’s coastal permit thresholds in mind.
- ADUs, custom or using one of the County’s pre-designed plans with a site plan we draw for your lot (see ADU plans in Monterey County).
- Construction drawings for County review, coordinated with a structural engineer, a soils engineer and Title 24 energy calculations; see our services.
Which coastal plan covers Carmel Highlands?
The County lists four coastal land use plans in its Local Coastal Program library. Carmel Highlands falls under the Carmel Area Land Use Plan (Part 4), which comes with the Carmel Coastal Implementation Plan and a list of background reports required in the Carmel area. County records for Highlands homes show “Plan Area: Carmel Area Land Use Plan” and zoning with a Design Control overlay in the coastal zone. South of the Highlands, the Big Sur Coast Land Use Plan (Part 3) applies instead. If your parcel is near that line, we confirm with the County which plan governs before design starts.
What a Highlands house goes through
A recent County Planning Commission item for a new house on a Carmel Highlands bluff shows the typical stack. The approval was a Combined Development Permit: a Coastal Administrative Permit and Design Approval for the home, plus separate Coastal Development Permits for building within 50 ft of a coastal bluff, on slopes over 30 percent, within 750 ft of known archaeological resources and for removing protected trees, and a variance for a reduced front setback. The project was reviewed by the Carmel Unincorporated/Highlands Land Use Advisory Committee, routed to the County’s Environmental Health Bureau, engineering and environmental services and the Carmel Highlands Fire Protection District, and documented with photo simulations.
Smaller projects can be simpler. The County’s design approval matrix adds a Coastal Administrative Permit for additions of 10 percent or more of the floor area between the sea and the first public road, and a habitable accessory structure needs a Coastal Administrative Permit in the coastal zone. Once planning approvals are in place, the building permit goes to County Housing and Community Development, with the site plan, construction drawings, structural, Title 24 and truss calculations and the geotechnical report listed in the submittal requirements. For remodels and additions on an existing Highlands house, see remodel and addition plans in Carmel Highlands.
Fire district conditions you can plan for
Carmel Highlands is served by the Carmel Highlands Fire Protection District, which provides fire protection through a contract with CAL FIRE. Per the District’s building permit page, you apply to the County, and the County forwards the approved set to the Fire Prevention and Planning office that also serves Pebble Beach and Cypress.
The District’s new residential conditions say fire sprinklers are required for all new residential projects, covering the house and attached garage, with sprinkler plans submitted separately by a C-16 licensed contractor. Driveways must be at least 12 ft wide and no steeper than 15 percent, driveways over 150 ft need a turnaround within 50 ft of the house, gates sit at least 30 ft back from the road, address signs must be reflective and readable from both directions, and vegetation must be managed within 100 ft of structures. On a steep Highlands lot, the driveway alone can shape the site plan, so we draw it first.
Sewer, septic and water
Some Highlands parcels are on septic and some connect to sewer. In the County record above, the house used a septic tank and a sewer line, and the County required a sewer connection permit from the Carmel Area Wastewater District before grading or building permits. For ADUs, the County’s ADU page notes that most properties under 1.25 acres on septic will need an alternative system with supplemental treatment, and that a Coastal Administrative Permit is required for an ADU in the coastal zone.
Water service varies by parcel. The same County record shows a home served by a small water distribution system permitted by the Monterey Peninsula Water Management District. Where a parcel is under the District, a Water Permit is needed for new homes, remodels and additions, issued only after the County approves the plans (application steps). We confirm your source of water early.
Examples of our drafting
We haven’t completed a project in Carmel Highlands yet; our portfolio shows homes in North San Luis Obispo County. Start with the Modern French Country home in Templeton, shown sheet by sheet and as built, and browse the rest of the portfolio for elevations and floor plans.
Close by: Carmel-by-the-Sea (and our Carmel-by-the-Sea new home guide), Carmel Valley (and our Carmel Valley new home guide), Pebble Beach (and our Pebble Beach new home guide), Monterey and the Monterey County guide. Our guide on what drives the cost of permit plans explains why steep coastal sites take more drawing.
How a Highlands project runs with us
- Parcel research. Coastal plan, zoning overlays, slopes, bluff setbacks, trees, septic or sewer, and water source.
- Site-first design. Driveway, fire access and building footprint, then the floor plan and 3D views.
- Planning drawings. Sheets and exhibits for the County’s coastal and design approvals and the advisory committee.
- Permit set. Construction drawings with engineering, energy compliance and fire district notes for HCD plan check.
Starting from a lot or a teardown? See custom home plans in Carmel Highlands.
Carmel Highlands FAQ
Who approves building plans in Carmel Highlands?
The County of Monterey. Carmel Highlands is unincorporated, and plans go to Housing and Community Development, with fire review by the Carmel Highlands Fire Protection District.
Is Carmel Highlands under the Big Sur plan?
County records place Carmel Highlands homes in the Carmel Area Land Use Plan. The Big Sur Coast Land Use Plan covers the coast farther south.
Will a new home in Carmel Highlands need fire sprinklers?
Yes. The fire district requires sprinklers for all new residential projects, with separate sprinkler plans from a C-16 licensed contractor.
What permits does a bluff-top home need?
A recent County approval combined a Coastal Administrative Permit and Design Approval with Coastal Development Permits for bluff, slope, archaeological and tree issues. The exact list depends on your lot.
Can I add an ADU on septic?
Possibly. The County says most lots under 1.25 acres on septic will need an alternative system with supplemental treatment, and a Coastal Administrative Permit is required in the coastal zone.
Also in Monterey County: home design in Big Sur (critical viewshed and coastal permits) and house plans for the Santa Lucia Preserve (Design Review Board and fuel management plans).
A builder for your Highlands plans
Harrod Built, our construction company (CSLB #986950), also serves Carmel Highlands, so the team that draws your plans can stay with them through construction. See Harrod Built in Carmel Highlands.
Ask about your Carmel Highlands lot
Phone 805-712-8993, or fill in the form with the parcel address, a short description and any survey or existing plans.
Permit, fire, sewer and water notes come from the County of Monterey, the Carmel Highlands Fire Protection District, the Carmel Area Wastewater District and the Monterey Peninsula Water Management District, checked October 6, 2026. Verify with those agencies before you design.