Permit-ready house plans & ADU design · SLO, Monterey & Santa Barbara CountiesCall 805-712-8993Request a design quote
Covered rear patio and pool behind a single-story stucco home

Home Design & Drafting in Big Sur, CA

New homes, fire rebuilds, additions and remodels on the Big Sur coast, drawn for Monterey County’s coastal permits and the critical viewshed rules.

Quick version: the Big Sur coast is unincorporated Monterey County, and its coastal planning area is part of the Coastal Zone. Its rules come from the Big Sur Coast Land Use Plan, adopted by the Board of Supervisors in 1985 and certified by the Coastal Commission in 1986. The rule that shapes every design is simple to state and hard to meet: no new development visible from Highway 1 or the major public viewing areas. In Big Sur, choosing the building site comes before the floor plan.

What we draw in Big Sur

  • Custom home design: new homes on vacant parcels, sited and shaped to stay out of view.
  • Fire and disaster rebuilds: replacement homes on the original footprint, drawn so they are no more visible than before.
  • Additions and remodels: careful additions to existing cabins and houses.
  • Permit sets: site plans, elevations, story pole plans, sections and energy compliance, with the engineer’s structural set.

The critical viewshed

The Big Sur Coast Land Use Plan defines the critical viewshed as everything within sight of Highway 1 and major public viewing areas, including turnouts, beaches and specific places such as Soberanes Point, Garrapata Beach, Abalone Cove Vista Point, Bixby Creek Turnout, Hurricane Point Overlook, upper Sycamore Canyon Road and Pfeiffer Beach. Its key policy prohibits new public or private development visible from those places. That covers buildings, roads, utilities, lighting and grading.

  • On a parcel only partly in the viewshed, the County looks at clustering, siting and design control to keep development out of view.
  • If another building site on the parcel would conform, the County can require it. It can also require changes in design, height or bulk.
  • Exterior lights that would be directly visible from those viewpoints are not allowed, and ocean views from Highway 1 cannot be blocked by berms or landscaping.
  • Where a project cannot be redesigned to conform, the plan treats the site as unsuitable for development.

Story poles and the on-site check

Every application gets an individual on-site investigation. Poles mark the dimensions, height and rooflines of the proposed buildings, flagged stakes mark access roads, and they stay in place through the whole review. The County photographs them with the project superimposed. The test is whether any part is visible from Highway 1 or the major viewing areas with normal, unaided vision, in any direction, at any time of year. Work built differently from the approved representations has to be removed.

For us that means the story pole plan is a design document, not an afterthought. We set ridge and eave heights, check them against the sightlines from the highway and nearby turnouts, and adjust the roof form before the poles go up.

Outside the viewshed

Parcels not visible from the highway still have siting rules. The plan asks owners to use the part of the parcel least visible from public viewpoints, to tuck buildings where topography or trees screen them, and to stay off open hillsides and silhouetted ridges. New buildings should be subordinate to their setting, in materials and colors that blend in. New roads are allowed only when existing roads cannot be used. They must avoid steep slopes, follow the contours and keep tree removal to a minimum.

Rebuilding after a fire

The plan generally encourages moving a replacement out of view. It also allows replacement or enlargement of a structure in the critical viewshed, including one lost in a fire or natural disaster, on its original location. That holds when no less visible part of the site is acceptable to the owner and the new work does not make the structure more visible. Outside the viewshed, a replacement is allowed as long as it does not intrude into view. We start a rebuild by documenting the old footprint, height and visibility so the new design can show it stays within them.

Water, streams and habitat

  • Water supply: applicants must show, by seasonal testing, an adequate supply of good quality. The plan gives at least half a gallon per minute year-round for a single-family home as an example. Developing a spring, stream or well needs its own permit on top of County Health permits, and wells are generally preferred over new surface diversions.
  • Stream setbacks: 150 feet on each side of the streambank, unless a narrower corridor is shown to protect the riparian vegetation.
  • Sensitive habitat: field surveys by qualified biologists where habitat is documented or expected, disturbance limited to what the structure needs, and native plants in landscaping. Redwood roots and landmark trees are protected.

Hazards and reports

The plan treats the whole coast as an area of hazardous or critical concern, so most projects do not qualify for the usual environmental review exemption. Building sites should avoid high-hazard parts of a parcel. Where a project is proposed in a high-hazard area, a geotechnical or environmental report is required before County review. Land within an eighth of a mile of an active or potentially active fault is treated as a high seismic hazard zone until a geotechnical study says otherwise. We plan for the geotechnical report, the biologist’s survey and, where needed, a hydrologist’s report before the design is fixed.

Fire is a constant concern on the coast. The plan notes long response times along Highway 1 and the role of the local volunteer brigades. CAL FIRE’s fire hazard severity zone maps show your parcel’s zone, and that zone drives the wildfire construction details on the plans: roofing, vents, siding, decking, and the access and water supply the fire reviewers ask for.

Permits with Monterey County

Planning approvals and building permits come from Monterey County Housing and Community Development. A new home normally needs a Coastal Development Permit before the building permit. The County lists what a building submittal needs on its submittal requirements page and takes applications through its online permit system. Septic systems and wells also go through the County’s Environmental Health review.

How a Big Sur project runs with us

  1. Parcel and viewshed study: zoning, visibility from Highway 1 and the named viewpoints, slopes, streams, habitat, hazards, water source and septic area.
  2. Siting and massing: the least visible building site and a roof envelope that stays below the sightlines.
  3. Consultants: geotechnical, biological, hydrologic and septic work scoped early, because the County needs those reports to review the project.
  4. Coastal permit set: site plan, elevations, story pole plan, materials and colors, and photo simulations.
  5. Building permit set: construction drawings with the engineer’s structure and the wildfire details.

Our work and nearby guides

Our office is in Paso Robles, and the plan sets we publish are North San Luis Obispo County homes, not Big Sur projects. See the Modern French Country home in Templeton for a full set next to the finished house. California law lets a designer like us prepare plans for wood-frame homes up to two stories and a basement (Business and Professions Code 5537), and a licensed engineer designs the structure when it is needed. Steep coastal sites usually need that engineering, and we bring it in from the start.

Nearby: Carmel Highlands, Carmel-by-the-Sea, the Santa Lucia Preserve, Cambria to the south, the Monterey County guide and the full list of areas we serve.

Big Sur questions

What is the critical viewshed in Big Sur?

Under the Big Sur Coast Land Use Plan, it is everything within sight of Highway 1 and major public viewing areas, including turnouts, beaches and named points such as Soberanes Point, Garrapata Beach, Bixby Creek Turnout, Hurricane Point and Pfeiffer Beach. The County’s policy is to prohibit new public or private development visible from those places, with a few listed exceptions.

Can I rebuild a Big Sur home lost to fire?

The plan allows replacement or enlargement of a structure in the critical viewshed, including one lost in a fire or natural disaster, on its original location, as long as no less visible part of the site is acceptable to the owner and the new work does not make the structure more visible. Outside the viewshed, replacement is allowed if it does not push the house into view.

Why does the County put up story poles in Big Sur?

Every development application gets an on-site check. Poles show the dimensions, height and rooflines of the buildings, flagged stakes mark access roads, and they stay up for the whole review. The County photographs them with the project superimposed and asks whether any part would be visible from Highway 1 or the major viewing areas.

How much water do I need to show for a new Big Sur house?

The plan asks applicants to prove by seasonal testing that the supply is adequate and of good quality, giving at least half a gallon per minute year-round for a single-family home as an example. Developing a spring, stream or well also needs its own permit, in addition to County Health permits, and wells are generally preferred over new stream diversions.

Do I need a Coastal Development Permit in Big Sur?

For a new home, almost always. The Big Sur coast planning area is in the Coastal Zone, and the County reviews new development against the certified Land Use Plan. Smaller work on an existing house can sometimes be exempt, which we check for each parcel with the County.

Can you design a house that stays out of the viewshed?

That is the starting point for every Big Sur design we do. We find the least visible building site, keep the roofline below the sightlines the County tests, and pick materials and colors that blend in, before we draw the floor plan.

Ready to build after approvals?

We design with real construction costs in mind, and our sister company Harrod Built can give you costing as the design comes together and build it when your Big Sur plans are approved. Same family, same office.

Planning a new home or a fire rebuild? Our guide to custom home design in Big Sur walks through the viewshed, story poles, water, habitat and the coastal permit. Working on an existing house? See remodel and addition plans in Big Sur.

Request a design quote for your Big Sur project

Call 805-712-8993 or send the parcel number or address, a few photos and a short note on what you want to build. A survey, old plans or permit history help. You can also use the contact page.











    Sources: Monterey County Big Sur Coast Land Use Plan (Local Coastal Program; adopted November 5, 1985, certified April 10, 1986, as amended), sections 3.2 (scenic resources), 3.3 (habitat), 3.4 (water) and 3.7 (hazards); Monterey County Housing and Community Development permit center pages; CAL FIRE Office of the State Fire Marshal hazard zone maps (checked October 17, 2026). Rules change, so we confirm the current policies with the County for each parcel before design.