Home Design & Drafting in Hope Ranch, CA
New homes, remodels, additions and ADUs drawn for the Hope Ranch Park Homes Association’s review and Santa Barbara County permits.
Quick version: Hope Ranch is in unincorporated Santa Barbara County, so the County issues the land use and building permits. Almost every exterior change also needs written approval from Hope Ranch Park Homes Association, and its CC&Rs set floor area, height and setback limits that are often tighter than County zoning. We draw one set of plans that works for both, in the order the Association lays out.
What we draw in Hope Ranch
- Custom home design: new estate homes and teardown rebuilds, from the site plan and massing to the permit set.
- Remodels and additions: second-story additions, kitchen wings, garage and guest house work on existing Ranch and Spanish homes.
- ADU plans: detached ADUs, converted accessory buildings and junior ADUs inside the house (see ADU plans in Santa Barbara County for the County side).
- Permit and review sets: the conceptual, preliminary and final packages the Association asks for, and the County construction drawings.
Two approvals: the Association, then the County
The Association’s Building Guidelines (approved in 2003, revised in 2020, with ADU rules added in December 2021) require an Association building permit to build, alter, move or remove nearly any structure, or to move more than 50 cubic yards of dirt. Changing surface drainage or removing a protected tree also needs written approval: any living tree with a trunk over 37.75 inches around, or a coast live oak over 19 inches around, measured six feet above the ground.
The guidelines lay out the usual sequence:
- Application to the Association.
- Conceptual approval by the Association.
- Land use permit application to County Planning and Development.
- Preliminary approval by the Association.
- Final approval by the Association.
- Building permit from the County.
- Association building permit, once a copy of the County-stamped plans is filed with it.
The Association’s design review board (known locally as the ABR) reviews each stage and makes a recommendation, and the Association’s Board of Directors approves. A remodel that involves 75 percent or more of the existing structure is treated as new construction at conceptual review. The guidelines strongly recommend talking with Association staff early, and that is where we start.
What each review stage asks for
- Conceptual: site photos, a conceptual site plan with setback lines, topography, trees and estimated cut and fill, square footage totals by category (residence, garage, guest house, studio, basement, stables), and rough floor plans and elevations. A professional survey with 2-foot contours and story poles kept up for 30 days or more may also be required.
- Preliminary: a site plan tied to an elevation benchmark, with easements, bridle trails, protected trees, utilities and the septic plan; a grading and drainage plan; a preliminary landscape plan; scaled floor plans with square footage; elevations tied to the benchmark; roof plans; and exterior materials and colors. The guidelines advise waiting for preliminary approval before starting construction documents.
- Final: the full construction set the County needs, including Title 24, structural, foundation, utility, grading and drainage, landscape, irrigation and parking plans, with any changes made after preliminary approval listed separately.
Size, height and setback limits
Section 4.03 of the guidelines repeats the CC&R limits that apply to every lot:
- Floor area: every residence at least 2,000 square feet (not counting porches, patios, basements and garages). All buildings on a lot of five acres or less may total 2,000 square feet plus 6 percent of the lot area, so a one-acre lot tops out near 4,614 square feet for the house, garage and accessory buildings combined. On lots over five acres the cap is 15,000 square feet plus 10 percent of the area over five acres.
- Height: 25 feet in the Coastal Zone and in Laguna Blanca Heights, 30 feet elsewhere, measured from the mean finished grade around the building to the highest point of the roof.
- Setbacks: 75 feet from the centerline of a road easement 80 feet wide or less, 125 feet from the centerline of a wider one, and 25 feet from all other property lines.
- Garage and parking: a two-car garage of at least 400 square feet, plus at least four non-tandem spaces outside the setbacks. Garage doors should not face the street unless screened.
- Roofs: Class A tile, slate, or shake-like or slate-like material, chosen from the Association’s pre-approved list or reviewed by its board.
- Guest house: one story, 800 square feet at most, no kitchen, no separate driveway or garage, and a recorded covenant not to rent it.
The guidelines note that traditional Ranch and Spanish styles still dominate, with other styles accepted. They favor low profiles, varied second-story heights, and towers and chimneys kept out of neighbors’ views of the ocean, Laguna Blanca and the mountains. View protection is written into the CC&Rs, so we design the roofline with neighbors’ views in mind from the first sketch.
ADUs in Hope Ranch
The Association’s ADU guidelines (adopted December 15, 2021) allow ADUs and junior ADUs on any Hope Ranch lot, subject to its review and every County permit, including a Coastal Development Permit where one is needed. A detached ADU is one story and 16 feet tall at most, though outside the Coastal Zone the Association may consider a variance. It is capped at 800 square feet, with a possible variance up to 1,200 square feet if privacy, safety and views are not harmed. A junior ADU stays inside the house and under 500 square feet. Converting an existing permitted structure can keep that structure’s height and floor area. Homes, ADUs and junior ADUs may not be rented for less than 30 days.
Santa Barbara County review
The County’s Eastern Goleta Valley Community Plan describes Hope Ranch’s ranchette neighborhoods as part of the area’s residential character. Lots near the ocean are in the Coastal Zone, where the County issues a Coastal Development Permit instead of an inland Land Use Permit. Zoning and development standards come from the County’s land use and coastal zoning codes, and applications and checklists are on its permit forms page.
Some Hope Ranch projects also go to the County’s South County design review board (SBAR). Its information packet lists the triggers: a lot in a Design Control overlay, a project under the hillside and ridgeline guidelines, a requested setback modification, certain projects in the Eastern Goleta Valley plan area, or a discretionary permit that calls for it. Pools, interior work, most decks and fences of 6 feet or less are exempt. The board’s agenda has its own Hope Ranch section. A complete application is due by 2 PM Friday, three weeks before the meeting, and every project starts with conceptual review.
Water, septic and fire
- Water: La Cumbre Mutual Water Company was formed in 1925 to serve Hope Ranch and the land between Hollister Avenue and the Ranch, and its shares belong to the landowners it serves. Some parcels are served differently, so we confirm the provider and any will-serve step by address.
- Septic: the Association asks for a septic system plan at the preliminary and final stages, and its guidelines note that the County requires a septic inspection when a property is sold. A bigger house or added bedrooms can mean a septic review with County Environmental Health.
- Fire: the guidelines say the County Fire Department has designated Hope Ranch a high fire hazard area, new driveways need County Fire approval, and vegetation should be managed within 100 feet of buildings. Santa Barbara County’s 2025 fire hazard severity zone maps show the zone for each parcel, and that zone sets the wildfire construction rules on the plans.
What the guidelines mean for the drawings
Beyond floor area, height and setbacks, the Association’s Building Guidelines carry detail rules that change what goes on the site plan, the roof plan and the landscape sheets. We draw to them from the first sketch, because finding one late usually means another round with the design review board.
Site plan: bridle trails, driveways, fences and gates
- Bridle trails: the standard trail is 10 feet wide with 12 feet of vertical clearance, and nothing may narrow or block it: no plantings, mailboxes, sprinklers, rocks, culverts, stakes or fences. We show the trail easement and its clear zone on the site plan.
- Driveway crossings: where a new or resurfaced driveway crosses a bridle trail, the Association recommends a level, non-skid paver crossing at least 6 feet wide, built to its own specifications. Other non-skid surfaces need its approval.
- Drainage: no driveway may send water across the road. Runoff is channeled to the existing drainage system, and the grading and drainage plan has to show how.
- One driveway: a guest house, studio or cabaña may not have a driveway of its own, and a driveway near a property line should be placed to keep cars away from the neighbors’ living areas.
- Fences, walls and gates: each one needs Association approval. Perimeter fences and walls are generally not favored, are considered only once their exact line is staked, and may not exceed 6 feet within setbacks. Chain-link, if approved, is black or another approved color and screened with planting. Entry gates sit at least 24 feet from the edge of the road pavement and may not look solid. Nothing goes in a road easement without Board approval and a signed agreement to remove it, and retaining walls that could not be removed are not approved there.
Accessory buildings, pools and roofs
- Accessory buildings: none may be built until the house is under construction, and the roof, walls and windows match the house in color and style unless the Board accepts a reason to differ. Only a guest house may be lived in.
- Studios, pool houses and cabañas: held to the same limits as a guest house (one story, 800 square feet, no kitchen, no separate driveway or garage) and not used as sleeping quarters. A guest house can be attached to or sit above another accessory building, but if the combined building is over 800 square feet there can be no interior access between the two.
- Pool and spa equipment: kept out of the setbacks, screened by planting, fencing or another approved means, and designed to keep noise down, with a vacuum breaker or anti-siphon valve on the fill lines.
- Flat roofs and skylights: flat roofs are discouraged. Where one is approved for a small part of the roof, it is covered with neutral rock or gravel that matches the sloped roof and kept out of view. Skylight and solar tube frames are bronzed or anodized to cut reflection, and skylights should not throw daytime glare or much interior light toward other homes.
- Garages and carports: garage doors should not be visible from the street, and carports may not be visible from the Common Area or neighboring properties. The guidelines define “not visible from the Common Area” as out of a casual passer-by’s line of sight, and “not visible from neighboring properties” as out of their primary line of sight.
Landscape and lighting sheets
- Landscape plan: every major construction project needs an approved landscape plan. It identifies the existing native vegetation by species and location and shows each new plant by species, to scale. The Board can require a landscaping bond or other security before the Association permit is issued.
- Sight lines and trees: planting may not block the view of drivers on the road or at driveways and intersections, or grow into a bridle trail. New trees at 24-inch box or larger, or with a trunk 3 inches or more across, go to the Association’s building administrator first for a check on how they could affect protected views as they grow. Screening the Association asks for has to reach maturity and do its job within two years of planting.
- Fire-wise planting: because County Fire has designated Hope Ranch a high fire hazard area, the guidelines favor plants that store water, stay low, hold little dead material and can resprout, and they list plants to use advisedly, among them eucalyptus, pine, cypress, acacia, most junipers, pampas and fountain grass, and California pepper trees within 50 feet of a structure. On slopes, deep-rooted ground covers hold the soil.
- Lighting: the plans show the layout and details of all outdoor lighting. Fixtures are hooded or deflected so the light source is not visible from typical viewing angles, light does not spill onto neighbors, the Common Area or passing drivers, and large numbers of fixtures or intense lights are not allowed. Game-court lights need Board approval after notice to owners within 300 feet.
Remodels: older and unpermitted work
Many Hope Ranch homes carry rooms or buildings from earlier rules or earlier owners. The guidelines handle them this way:
- Non-conforming structures (built legally under old rules): when you apply for a permit, the Board can ask that a non-conformity be corrected if that is a natural part of the project and in proportion to it, but it will not require demolition of legal habitable square footage.
- Unpermitted work (the guidelines give guest house kitchens and unpermitted habitable space as examples): it has to be permitted under current rules, with inspections passed, or removed. Unpermitted habitable space inside a permitted building is either permitted or, at the Board’s discretion, made uninhabitable or removed.
- At a sale: Association staff inspect the lot and check its permit files, and non-conforming structures are documented. If you are buying with a remodel in mind, those records and our as-built measurements are where the design starts.
- Variances: where topography, property lines, trees or similar conditions justify it, the Board can allow a variance. The request goes in writing with a plot plan and conceptual drawings, the Association mails it to owners within 300 feet at least 30 calendar days before the hearing, and the Board may visit the property in that window. We prepare the plot plan and drawings for the request alongside the conceptual package.
Paperwork that travels with the plans
- Authority to act: before a designer or other agent can represent you with the Association, a power of attorney or other evidence of authority has to be on file with it.
- Staking: every structure is staked in the field and approved by Association staff before excavation starts, and staff can ask for a licensed surveyor to mark the property and setback lines.
- Changes during construction: any change is approved by Association staff or the Board before it is built and documented in writing for both the Association and the County. Substantial changes go back to the design review board.
- Timing: after final Board approval, the Association permit has to be requested within two years. Construction then starts within a year of that permit and is completed within 24 months of starting, unless the Board sets a shorter period.
- As-built files: when the work is done, the Association keeps a digital copy of the County-approved final grading, drainage and building plans showing the as-built details, in DXF, DWG or TIFF format. Ask us for those files when the project closes out.
How a Hope Ranch project runs with us
- Parcel check: CC&R floor area and setback math, Coastal Zone or Laguna Blanca Heights height limit, deed restrictions, easements and bridle trails, septic or sewer, and the water provider.
- Early staff meeting: scope and timing with Association staff, as the guidelines recommend.
- Conceptual package: site plan, square footage table, sketches, and story poles if required.
- Preliminary and County application: full design drawings for the Association and the land use or coastal permit application for the County, plus SBAR review if triggered.
- Final and permit set: construction drawings for County plan check and the Association’s final review, with a licensed engineer for the structure.
Our work and nearby guides
We are based in Paso Robles. The plan sets we publish are North San Luis Obispo County homes, not Hope Ranch projects. See the Modern French Country home in Templeton for a full set next to the finished house. California law lets a designer like us prepare plans for wood-frame homes up to two stories and a basement (Business and Professions Code 5537), and a licensed engineer designs and stamps the structure when it is needed. Larger or more complex projects may need other licensed professionals, and we will tell you up front if yours does.
Nearby: Santa Barbara, Goleta, Montecito, the Santa Barbara County guide and the full list of areas we serve.
Also in the unincorporated foothills: Mission Canyon home design and drafting. In the city, see City of Santa Barbara ADU plans.
Reworking an existing house? See remodel and addition plans in Hope Ranch. Adding a second unit? See ADU plans in Hope Ranch.
Hope Ranch questions
Who approves plans in Hope Ranch?
Two bodies. Hope Ranch Park Homes Association must approve almost any exterior change under its CC&Rs and Building Guidelines, and Santa Barbara County Planning and Development issues the land use or coastal permit and the building permit. The Association’s own permit is issued last, once the County-stamped plans are on file with it.
How big can a house be in Hope Ranch?
The Building Guidelines repeat the CC&R limit: on a lot of five acres or less, all buildings together may total 2,000 square feet plus six percent of the lot area. On larger lots the cap is 15,000 square feet plus ten percent of the area over five acres. A residence also has to be at least 2,000 square feet, not counting porches, patios, basements and garages.
What is the height limit in Hope Ranch?
Under the Association’s guidelines, 25 feet in the Coastal Zone and in the Laguna Blanca Heights area, and 30 feet elsewhere in Hope Ranch, measured from the mean finished grade around the structure to the highest point of the roof. The County’s zoning limit also applies, and the stricter number controls.
Can I build an ADU in Hope Ranch?
Yes. The Association adopted ADU guidelines on December 15, 2021 that allow ADUs and junior ADUs on any lot, subject to its review and County permits. A detached ADU is limited to one story and 16 feet, and to 800 square feet unless a variance allows up to 1,200. A junior ADU is limited to 500 square feet inside the house.
Will my Hope Ranch project need story poles?
Often. The Association can require story poles or string lines at conceptual review to show the height and extent of the new work, left in place for 30 days or more, and sometimes certified by a licensed surveyor. The County’s design review board may also ask for them if the project goes to that board.
Is Hope Ranch on sewer or septic?
It depends on the parcel. The Association’s guidelines ask for a septic system plan at the preliminary and final stages and note that the County requires a septic inspection when a property sells, so many lots are on septic. We confirm the sewer or septic situation and the water provider for each address before design.
Can I put a fence or gate along the road in Hope Ranch?
Every fence, wall and gate needs Association approval, and perimeter fences and walls are generally not favored, so they are considered only once the line is staked. Fences and walls within setbacks top out at 6 feet, entry gates sit at least 24 feet from the edge of the road pavement and may not look solid, and nothing is built in a road easement without Board approval and a signed agreement to remove it.
What happens to unpermitted rooms when I remodel in Hope Ranch?
Under the Association’s guidelines, unpermitted work such as a guest house kitchen or unpermitted habitable space has to be permitted under current rules, with inspections passed, or removed. Legally built but non-conforming structures are treated differently: the Board can ask for a correction that is a natural, proportional part of your project, but it will not require demolition of legal habitable square footage.
Ready to build after approvals?
We design with real construction costs in mind, and our sister company Harrod Built can give you costing as the design comes together and build it when your Hope Ranch plans are approved. Same family, same office.
Request a design quote for your Hope Ranch project
Call 805-712-8993 or send the address, a few photos and a short note on what you want to build or change. Earlier plans or a survey help if you have them. You can also use the contact page.
Sources: Hope Ranch Park Homes Association Building Guidelines (approved April 2003, revised January and July 2020, ADU guidelines December 15, 2021); Santa Barbara County Planning and Development design review information packet (updated July 31, 2026) and South County board bylaws; Eastern Goleta Valley Community Plan; La Cumbre Mutual Water Company; Santa Barbara County Fire Department hazard zone map release (checked October 17, 2026; Building Guidelines rechecked October 19, 2026). Rules and CC&R interpretations change, so we confirm with the Association and the County for each property before design.