Kitchen with a large island, pendant lights and a range wall

Home Design & Drafting in Carpinteria, CA

House plans, remodels, additions and ADUs for Carpinteria, drawn for coastal permits, the City’s design review board and the fire district.

Quick version: Carpinteria lies in the Coastal Zone, so most new homes and additions start with a Coastal Development Permit from the City, a stop at its design review board and, for larger projects, a Planning Commission hearing. After that come building plan check and a Fire Protection Certificate from the Carpinteria-Summerland Fire Protection District. Water and sewer letters come into play for ADUs. We lay out that sequence for your lot before the design gets detailed. Call 805-712-8993.

Carpinteria work we draw

  • New homes and rebuilds, from beach-neighborhood lots to the foothill side of town.
  • Remodels and additions, including second stories and kitchen and bath work.
  • ADUs and junior ADUs, custom or built on the City’s prototype plans.
  • Permit drawings: site plans, floor plans, elevations, sections, energy compliance and structural engineering coordination.

Coastal permits and the Planning Commission

The City’s applicant guide explains the path. Every new project is checked by Community Development staff against the Local Coastal Plan, the General Plan and the zoning ordinance. A Development Plan and Coastal Development Permit is required for all new development in most zone districts, and in Carpinteria any development entitlement, such as a Development Plan, Conditional Use Permit or grading permit, also serves as the coastal permit.

  • Conceptual review: an optional pre-application step that flags policy or environmental problems before you invest in full drawings.
  • Completeness: staff decide within 30 days whether the application is complete, then screen it for environmental review.
  • Hearing: the Planning Commission meets the first Monday of each month, and owners within 300 feet get mailed notice at least 10 days ahead.
  • Appeals: 10 calendar days to the City Council, and projects in the coastal appeals overlay can be appealed to the Coastal Commission.

The City’s design review board

Most changes to how a property looks go to design review. When a project needs a Development Plan or Conditional Use Permit, the board reviews it twice: a preliminary review of the site plan, building elevations, landscape plan and signage before the Planning Commission, and a final review after the Commission approves. We prepare drawings for both stages, including the elevations and landscape plan the board wants to see.

Building plan check

Once every planning approval is in hand, the 2026 building permit packet applies. Plans can be dropped off at City Hall, mailed, or emailed to the Community Development Department with the subject line “Building Permit Submittal: Job Address.” The application does not count as received until the package is complete. The City says initial plan check can take four to eight weeks, and it requests the plan check deposit by email after the first look.

The City’s guide also sums up who can prepare plans under state law. Unlicensed designers may prepare plans for wood-frame single-family homes of up to two stories and a basement, but not structural or seismic components. That is how we work: we draw the house, and a licensed engineer designs and stamps the structure when it is needed.

Fire district review

The Carpinteria-Summerland Fire Protection District has its own step. A Fire Protection Certificate is required for all new residential buildings, additions of 250 square feet or more (garages and utility buildings included), and alterations to a house that has a fire sprinkler system. After the City accepts the submittal, it forwards the plans to the District, which emails a letter of conditions to the City and the applicant. In wildland-urban interface and high fire areas, the District’s vegetation management standard calls for a plan showing topography, property lines, fuel zones, access clearance and a maintenance schedule, approved before combustible materials go up.

ADUs in Carpinteria

The City Council adopted ADU Ordinance 758 on January 23, 2023, after Coastal Commission action in December 2022, and it took effect February 22, 2023 (Municipal Code Chapter 14.72). The ADU program page offers two prototype plans for a new detached unit, Plan 1 at 400 square feet and Plan 2 at 480 square feet. They still need a Coastal Development Permit and a building permit. The City’s ADU building permit packet requires intent-to-serve letters from Carpinteria Valley Water District and Carpinteria Sanitary District, and a Coastal Development Permit for all ADUs and JADUs in the Beach Neighborhood. When the prototypes don’t fit the lot or the main house, we design a custom ADU.

Inside city limits or in the County?

Summerland, Toro Canyon and the unincorporated Carpinteria Valley are reviewed by Santa Barbara County, not the City, even with a Carpinteria address. For those parcels, start with our Santa Barbara County guide, or Montecito just up the coast. Building new in Summerland? See new home plans in Summerland.

Our work and nearby guides

We are based in Paso Robles, and the plan sets we show are North San Luis Obispo County homes, not Carpinteria projects. The Modern French Country home in Templeton shows the drawings and the finished house built from them.

More south coast guides: Santa Barbara, Goleta, Montecito, Ventura and Ojai. All towns: areas we serve.

How a Carpinteria project runs

  1. Parcel review: zone, coastal appeals overlay, fire hazard area, and whether the lot is in the City or the County.
  2. Concept: layouts and massing, with optional conceptual review at the City for bigger projects.
  3. Entitlements: coastal permit and design review drawings, and the hearing set if one is needed.
  4. Construction set: building plans, the fire certificate package and the water and sewer letters.

Building new? See custom home plans in Carpinteria.

Adding a unit in the city? Carpinteria has its own ADU rules and sits entirely in the coastal zone. See ADU plans in Carpinteria.

Carpinteria questions

Does a new house in Carpinteria need a coastal development permit?

In most cases, yes. Carpinteria lies in the Coastal Zone, and the City’s applicant guide says any activity that counts as development under the Coastal Act needs a Coastal Development Permit unless it is exempt. In Carpinteria, a Development Plan, Conditional Use Permit or grading permit also serves as the coastal permit. Projects in the coastal appeals overlay can be appealed to the Coastal Commission.

What does the design review board look at?

Most projects that change how a property looks go to the City’s design review board. When a Development Plan or Conditional Use Permit is involved, you apply for preliminary review of the site plan, building elevations and landscape plan, and final review follows Planning Commission approval.

Can I use the City’s ADU prototype plans?

Yes. Carpinteria offers two stock plans for a new detached ADU: Plan 1 at 400 square feet and Plan 2 at 480 square feet. Using them still requires a Coastal Development Permit and a building permit, and the ADU building application asks for intent-to-serve letters from Carpinteria Valley Water District and Carpinteria Sanitary District.

When does the fire district review my plans?

The Carpinteria-Summerland Fire Protection District issues a Fire Protection Certificate for all new residential buildings, additions of 250 square feet or more (garages included), and alterations to a house with fire sprinklers. The City forwards the plans, and the District emails a letter of conditions. In high fire areas, a vegetation management plan is approved before combustible materials go up.

How long is building plan check in Carpinteria?

The City’s 2026 building permit packet says initial plan check review can take four to eight weeks. Plans are emailed to the Community Development Department with a set subject line, and the plan check deposit is requested by email after the first review.

My address is in Summerland or the Carpinteria Valley foothills. Does the City review it?

Only if the parcel is inside city limits. Summerland, Toro Canyon and the unincorporated valley are reviewed by Santa Barbara County Planning and Development. See our Santa Barbara County guide.

From plans to a finished home

After the City approves your Carpinteria plans, our sister company Harrod Built can bid the construction.

Get a design quote for Carpinteria

Call 805-712-8993 or use the form with your address or parcel number, a few photos and what you want to build or change. Or reach us through the contact page.











    Sources: City of Carpinteria applicant guide, ADU program page, 2026 building permit application packet and ADU/JADU building permit packet; Municipal Code Chapter 14.72; and the Carpinteria-Summerland Fire Protection District prevention page and vegetation management standard (checked October 16, 2026). Rules change, so we confirm with the City and the districts for each property before design.