
Home Design & Drafting in Ojai, CA
House plans, additions, remodels and ADUs for the Ojai Valley, drawn for the City’s design review triggers, tree rules and fire department review.
Quick version: inside city limits, the City of Ojai Community Development Department handles planning and building, and the Ventura County Fire Department reviews fire safety. Whether your house goes before the Planning Commission comes down to height and stories. Trees, slope and fire access shape the rest of the plan set. Outside city limits the County of Ventura reviews the plans, so we start by confirming which side of the line your parcel is on. Call 805-712-8993.
Ojai projects we draw
- New homes on in-town lots and valley parcels, single-story or two-story.
- Additions and remodels, including second-story additions and kitchen and bath remodels.
- ADUs and junior ADUs, detached, attached or converted from a garage.
- As-built drawings for older work being brought into compliance, including second units (see the ADU section below).
When the Planning Commission reviews the design
Ojai’s Design Review Permit page explains why the City takes design seriously: the town’s character comes from its mountain-and-valley setting and from buildings suited to its climate. For houses, the trigger is set out in Ojai Municipal Code 10-2.2003 and summarized in a City staff memo: a new two-story house, a second-story addition, or a single-story house 24 feet or taller needs a Design Review Permit, heard by the Planning Commission. A one-story house under 24 feet in a single-family zone generally goes straight to plan check. The review looks at fit with the street, scale, views and natural landforms, and materials and colors.
That makes the roof the first design decision in Ojai. If a second story or a tall ceiling is important to you, we plan for the hearing, the drawings it needs and the time it adds. If staying ministerial matters more, we design to stay under the trigger.
What the City wants on the plans
Building and planning applications go in together: the Building and Safety Division asks for a Zoning Clearance with every building permit, plus a ground disturbance statement, and the City has 30 days to decide whether an application is complete. Its submittal packet spells out what the plans must show. Several items are particular to Ojai:
- Trees: every existing tree plotted by species and trunk diameter, trees on neighboring lots that the work could affect, and a tree protection area five feet outside the drip line. Protected trees bring in a tree permit.
- Hillside height survey: on hillside lots, elevations at five points along the front and rear property lines and the rear setback line, on the site plan itself, signed by a licensed civil engineer or land surveyor, with the height worked out by the City’s hillside formula.
- Height surveys elsewhere: needed for new construction at or near the height limit, measured from the top of curb and from adjacent grade.
- Fire access: existing and proposed fire hydrants within 300 feet of the project, and the water and sewer connections.
- Landscape: the state water-efficient landscape form, and a site summary of building, paving and landscape area.
Fire department review
Ojai is one of the cities served by the Ventura County Fire Department. Its Fire Prevention Bureau reviews access, water supply and fire safety, and its plan reviews typically take two to three weeks. The department says all structures built in its jurisdiction need automatic fire sprinklers, with listed exceptions, and sprinkler plans are approved before installation. The City posts the fire permit application (Form 610) and a fire map on its building page. Much of the valley is wildfire country, so we plan materials, vents, decks and defensible space into the design from the start.
ADUs in Ojai
ADUs in Ojai follow Municipal Code 10-2.1709, as amended by Ordinance 921. They are exempt from the City’s growth management allocation and traffic mitigation policies, and they cannot be used as short-term rentals. A new detached or attached ADU that stays single-story and under 24 feet avoids design review, and each new unit gets its own address assignment. For an older second unit built without permits, the City’s ADU/Second Unit Compliance Program offers an amnesty path with reduced City charges. We check current eligibility with the City first.
City of Ojai or County of Ventura?
Many addresses with an Ojai mailing address are outside the city. Meiners Oaks, Mira Monte, Oak View and the rest of the unincorporated valley are reviewed by the County of Ventura Resource Management Agency, which publishes its own ADU rules and free standardized detached ADU plans. We check the parcel number before anything else so the plans are drawn to the right code.
Our work and nearby guides
Our office is in Paso Robles, and the plan sets we publish are North San Luis Obispo County homes rather than Ojai projects. See the Modern French Country home in Templeton for a full set beside the finished house. We prepare plans for wood-frame homes up to two stories and a basement, as California’s Business and Professions Code 5537 allows, and bring in a licensed engineer for structural design when needed.
Also nearby: Ventura, Carpinteria, Santa Barbara and Montecito. All towns: areas we serve.
Working with us on an Ojai house
- City or County: we confirm the jurisdiction, zone, slope and trees from the parcel number.
- Height decision: one story under 24 feet, or plan for Planning Commission review.
- Measured drawings and design: existing conditions, then layouts and elevations with you.
- Submittal: Zoning Clearance, building set, tree and survey sheets, and the fire department package.
Ojai FAQ
Does my Ojai house need a Design Review Permit?
It depends on height and stories. Under Ojai Municipal Code 10-2.2003, a new two-story house, a second-story addition, or a one-story house 24 feet or taller needs a Design Review Permit, which the Planning Commission hears. A single-story house under 24 feet in a single-family zone generally does not. We set the roof height early so you know which path you are on.
Will my Ojai project need fire sprinklers?
Very likely. Ojai is served by the Ventura County Fire Department, which says all structures built in its jurisdiction must have automatic sprinklers, with exceptions set out in its ordinance. Sprinkler plans are approved by its Fire Prevention Bureau before installation, and its plan reviews typically take two to three weeks.
What goes in an Ojai ADU submittal?
The City’s ADU packet lists a Zoning Clearance form, a signed building permit application, an 11 x 17 plan set plus a digital copy, setbacks, utility trenching, retaining walls, trees and drip lines, a ground disturbance statement, the water-efficient landscape form, and an address assignment for the new unit. Lots on a slope need topography, and the hillside standards can bring in design review.
Can an ADU in Ojai be used as a vacation rental?
No. Section 10-2.1709 says no accessory dwelling unit may be used as a short-term rental. ADUs are exempt from the City’s growth management allocation and its traffic mitigation policies.
I have an old unpermitted second unit in Ojai. Is there a way to legalize it?
The City runs an ADU/Second Unit Compliance Program for qualifying existing units, with its own guidelines and reduced City charges, and an approved permit gives the unit legal nonconforming status. The cutoff dates have been amended over time, so we confirm eligibility with Community Development and then draw the as-built plans.
My address says Ojai but I am outside city limits. Who reviews my plans?
The County of Ventura. Meiners Oaks, Mira Monte, Oak View and the rest of the unincorporated Ojai Valley go through County Resource Management Agency planning and building, not the City. The County also offers its own free standardized detached ADU plans.
Planning to build?
Once your Ojai plans are approved, ask about our sister company Harrod Built for the construction bid. Same family, same office.
Ask for a quote on your Ojai plans
Phone 805-712-8993, or send the address or parcel number, a few photos and what you have in mind using the form. The contact page works as well.
Sources: City of Ojai Design Review Permit page and staff memo on Municipal Code 10-2.2003; Building and Safety Division page and forms; ADU minimum submittal packet; Ordinance 921 amending section 10-2.1709; Ventura County One-Stop Permitting fire department page; and the County of Ventura ADU page (checked October 16, 2026). Rules change, so we confirm with the City, the County and the fire department for each property before design.