Permit-ready house plans & ADU design · SLO, Monterey & Santa Barbara CountiesCall 805-712-8993Request a design quote
Finished front entry of a single-story stone and stucco home designed by Harrod Drafting & Design

Home Design & Drafting in Pebble Beach

New homes, remodels and additions in the Del Monte Forest, drawn for Monterey County coastal review.

Pebble Beach sits inside the Del Monte Forest, in the coastal zone of unincorporated Monterey County. A new home or a large addition here can involve a coastal permit, design approval, tree review, a sewer permit from the community services district and a Water Permit. We draw the plan set with each of those steps in mind.

What we draw for Pebble Beach homeowners

  • Custom home design: New homes and rebuilds in Pebble Beach, drawn to fit the lot and the local review steps. Our Pebble Beach new home plans guide walks through Pebble Beach Company design review, the Pescadero coverage cap and the fire, sewer and water permit steps.
  • ADU plans: Detached and attached ADUs, junior ADUs and garage conversions, custom or alongside a pre-designed plan. See ADU plans in Monterey County for the County permit set and the coastal permit.
  • Remodel and addition plans: Additions, second stories and remodels for existing homes.
  • Drafting and permit sets: Site plans, floor plans, elevations, sections and 3D views for the County of Monterey, with structural engineering coordination and Title 24 energy compliance.

Coastal permits in the Del Monte Forest

The County reviews Pebble Beach projects under the Del Monte Forest Land Use Plan and Coastal Implementation Plan, and its library lists the background reports required in the Del Monte Forest. County records show how a typical new home is handled: a recent Pebble Beach house was approved with a Coastal Administrative Permit and Design Approval, plus a separate Coastal Development Permit to remove protected oak, pine and cypress trees. Plans then go to County Housing and Community Development for the building permit, with the full set in the County’s submittal requirements. Working on an existing house? See remodel and addition plans in Pebble Beach.

Additions are reviewed by size and location: the County’s design approval matrix adds a Coastal Administrative Permit for additions of 10 percent or more of the floor area between the sea and the first public road, and new second stories can go to a public hearing.

Sewer, fire and water

The Pebble Beach Community Services District handles sewer permits. The application can be emailed to the District, the contracted plumber must be registered with it, and its sewer lateral requirements call for a District inspection before any lateral work is backfilled, requested at least 24 hours ahead.

The District also runs the Pebble Beach Fire Department. Water comes through the Monterey Peninsula Water Management District Water Permit, which you get after the County approves your plans, and the District does its own final inspection when the work is done.

Harrod projects near Pebble Beach

Our published plan sets are North San Luis Obispo County homes, including the Modern French Country home in Templeton, shown as plan sheets and as the finished home Harrod Built built from them. Browse the portfolio to see the level of detail we draw for Pebble Beach projects.

Harrod Built also serves Pebble Beach; see Harrod Built in Pebble Beach. Nearby guides: Pacific Grove, Monterey, Carmel-by-the-Sea (and our Carmel-by-the-Sea new home guide), Carmel Highlands, Carmel Valley and Salinas, plus the Monterey County guide.

Guides that apply anywhere: what’s in a permit set, Title 24 energy rules for additions, ADU vs junior ADU and what drives the cost of permit plans.

How it works

  1. Call or send your Pebble Beach address. We check zoning, overlays, setbacks and which agencies review your parcel.
  2. Design. Layout options and 3D views, revised with you until the plan fits your lot and budget.
  3. Permit set. We prepare the drawings for the County of Monterey, with structural engineering coordination and Title 24 energy compliance.
  4. Build. Our sister company Harrod Built can give you costing as the design comes together and build it when you’re ready.

Pebble Beach FAQ

Who reviews plans in Pebble Beach?

The County of Monterey. Pebble Beach is unincorporated and in the coastal zone, under the Del Monte Forest Land Use Plan.

Do I need a coastal permit to build a new home in Pebble Beach?

County records show new homes approved with a Coastal Administrative Permit and Design Approval, and a separate Coastal Development Permit when protected trees are removed. We confirm the path for your lot.

Who issues sewer permits in Pebble Beach?

The Pebble Beach Community Services District. Your plumber must be registered with the District, and it inspects sewer work before backfill.

Will I need a water permit?

Yes for most new homes, remodels and additions. The Monterey Peninsula Water Management District issues it after the County approves your plans.

Ready to build?

Every design is drawn with real construction costs in mind, and our sister company Harrod Built (CSLB #986950) can give you costing along the way and build it when your plans are approved. Same family, same office, no hand-off gap. See Harrod Built in Pebble Beach.

Request a design quote for your Pebble Beach project

Call 805-712-8993 or send your address and a few details below.











    Permit, water and fire details on this page come from the official websites linked above (checked October 6, 2026). Rules change, so confirm with the County of Monterey, the Pebble Beach Community Services District and the Monterey Peninsula Water Management District before you design.