Permit-ready house plans & ADU design · SLO, Monterey & Santa Barbara CountiesCall 805-712-8993Request a design quote
Finished front entry of a single-story stone and stucco home designed by Harrod Drafting & Design

Home Design & Drafting in Carmel Valley

New homes, ADUs and remodels for Carmel Valley’s larger, rural lots, drawn for Monterey County review.

Carmel Valley is unincorporated Monterey County. Some parcels are on septic, and parts of the valley fall under the County’s design control rules. We draw custom homes, ADUs, additions and remodels here with the County’s review, the fire district’s rules and your site in mind.

What we draw for Carmel Valley homeowners

Permits in Carmel Valley: County of Monterey HCD

Carmel Valley is unincorporated, so plans go to the County of Monterey Housing and Community Development department through Accela Citizen Access or the permit center in Salinas. A new house or addition needs the full set in the County’s submittal requirements: site plan, construction drawings, structural, Title 24 and truss calculations, and a geotechnical report.

Land use in the valley is guided by the Carmel Valley Master Plan, Chapter 9.B of the 2010 Monterey County General Plan (amended in 2013). Where a parcel is in a Design Control or Visually Sensitive district, the County’s design approval matrix applies: new second stories can go to a public hearing if they could have a substantial adverse impact, and “S” and “VS” projects get a site visit.

Fire sprinklers in a major remodel

Much of Carmel Valley is served by the Monterey County Regional Fire District, which lists Carmel Valley and Mid Carmel Valley in its service area. The District amended the Fire Code so that a major remodel or addition triggers sprinklers for the whole building. Its remodel calculation form adds up the walls being replaced, removed and added; if that reaches 50 percent of the existing walls within five years, the entire building must be sprinklered and the note goes on your plans. We run that calculation early, because it can change the budget.

Septic, water and ADUs

If your lot is on a septic system, plan ahead for an ADU: the County’s Environmental Health Bureau says that in most cases a property under 1.25 acres on septic will need an alternative system with supplemental treatment to add an ADU (County ADU page). Parcels on the Cal Am system may also need a Water Permit from the Monterey Peninsula Water Management District. The County’s three pre-designed ADU plans (515, 749 and 1,200 sq ft) can be used here, with a site plan we draw for your lot, or we design a custom ADU.

Harrod projects near Carmel Valley

Our published plan sets are North San Luis Obispo County homes, including the Modern French Country home in Templeton, shown as plan sheets and as the finished home Harrod Built built from them. Browse the portfolio to see the level of detail we draw for Carmel Valley projects.

Harrod Built also serves the valley; see Harrod Built in Carmel Valley. Nearby guides: Carmel-by-the-Sea (and our Carmel-by-the-Sea new home guide), Pebble Beach (see also our Pebble Beach new home guide) and Salinas and the Monterey County guide.

Guides that apply anywhere: what’s in a permit set, Title 24 energy rules for additions, ADU vs junior ADU and what drives the cost of permit plans.

How it works

  1. Call or send your Carmel Valley address. We check zoning, overlays, setbacks and which agencies review your parcel.
  2. Design. Layout options and 3D views, revised with you until the plan fits your lot and budget.
  3. Permit set. We prepare the drawings for the County of Monterey, with structural engineering coordination and Title 24 energy compliance.
  4. Build. Our sister company Harrod Built can give you costing as the design comes together and build it when you’re ready.

Over the Laureles Grade toward Salinas, see Corral de Tierra and the Toro area, where groundwater and the B-8 overlay shape what you can build.

Carmel Valley FAQ

Who issues building permits in Carmel Valley?

The County of Monterey Housing and Community Development department. Carmel Valley is unincorporated.

Will my Carmel Valley remodel need fire sprinklers?

It might. The Monterey County Regional Fire District requires sprinklers in the whole building when replaced, removed and added walls reach 50 percent of the existing walls within five years. We run the District’s calculation during design.

Can I add an ADU on septic?

Possibly. The County’s Environmental Health Bureau says most properties under 1.25 acres on septic will need an alternative system with supplemental treatment for an ADU. Larger lots may have more options.

What plan governs land use in Carmel Valley?

The Carmel Valley Master Plan, Chapter 9.B of the 2010 Monterey County General Plan.

Also in Monterey County: home design in Big Sur (critical viewshed and coastal permits) and house plans for the Santa Lucia Preserve (Design Review Board and fuel management plans).

Ready to build?

We design with real construction costs in mind, and our sister company Harrod Built (CSLB #986950) can give you costing as the design comes together and build it when your plans are approved. Same family, same office, no hand-off gap. See Harrod Built in Carmel Valley.

Request a design quote for your Carmel Valley project

Call 805-712-8993 or send your address and a few details below.











    Permit, water and fire details on this page come from the official websites linked above (checked October 6, 2026). Rules change, so confirm with the County of Monterey, the Monterey County Regional Fire District and your water provider before you design.