ADU Plans in the Salinas Valley: Gonzales, Soledad, Greenfield & King City
Backyard units, garage conversions and junior ADUs in the four Salinas Valley cities, drawn to each city’s rules or fitted around its pre-approved plans.
Quick version: each Salinas Valley city runs its own ADU permits, and three of them offer free pre-approved plans for new detached units. Those plans save time, but they still need a site plan, energy forms and lot-specific details, and they do not cover garage conversions or attached units. We draw the site work around a city plan, or a custom unit when the lot calls for one. Call 805-712-8993.
Gonzales
The City’s ADU page offers four pre-approved detached ADU plans with Design Path Studio: 1A one bed/one bath (495 sf), 1B one bed/one bath (553 sf), 2A two bed/two bath (749 sf) and 2B two bed/one bath (746 sf), in Craftsman, Mid-Century, Ranch and Spanish styles. Exterior options can be customized but must match the design standards of the main house, and owners submit a hold harmless form and added documents. The City says the plans are only for new detached ADUs inside city limits; existing or attached units cannot use them.
Soledad
Soledad offers the same four plan types through its ADU page, developed with the City of Salinas and Design Path Studio. To use one, the City asks for:
- the prefilled pre-approved plan set (sheet T1.1 lists the choices for style, siding, roof, sprinklers, utilities, soils and foundation);
- a site plan;
- supplemental documents where they apply, such as Title 24 energy forms, solar, truss calculations or a soils report;
- a hold harmless statement signed by the owner and the grant deed;
- the building permit application, uploaded through the City’s SmartGov portal.
The City’s handbook lists a maximum unit size of 1,200 square feet for custom units, with 4-foot side and rear setbacks for new detached ADUs. A meeting with a planner is suggested but not required.
Greenfield
Greenfield’s updated ADU ordinance took effect May 22, 2025. The City’s ADU page lists the steps: contact Planning to confirm eligibility, hire a designer, apply with plans and Title 24 forms (digital preferred), pay for plan check (within 72 hours for electronic applications, or the application is cancelled), work through plan check, then permit, inspections and a Certificate of Occupancy. A junior ADU of up to 500 square feet requires the owner to live on site and a recorded deed restriction before the permit.
King City
King City’s rules are in Chapter 17.47 of its municipal code, and its ADU flyer sums them up:
- one ADU and one junior ADU per property, in any zone that allows homes;
- standard ADU 850 square feet for a studio or one bedroom, 1,000 square feet for two; junior ADU 500 square feet; 150 square feet minimum;
- 16-foot height and 4-foot setbacks for new units;
- materials and design compatible with the house;
- City water and sewer and PG&E electric required (no septic), and a sewer lateral inspection before the ADU permit;
- plans submitted through the City’s Citizenserve portal, with comments within two weeks of each submittal;
- pre-approved plans available for new detached ADUs.
City plan or custom drawings?
- Pre-approved plan: a good fit for a new detached one- or two-bedroom unit on a flat lot with room for the footprint. We prepare the site plan, utility routing, energy forms and the sheet T1.1 choices.
- Custom: needed for a garage conversion, an attached unit, a junior ADU, a larger unit, or a lot where the city plan does not fit the setbacks or the house’s style.
- Outside city limits: County rules apply; the County also offers its own pre-designed ADU plans.
Who draws the plans
Harrod Drafting & Design is a Paso Robles drafting and design office. The plan sets on our portfolio are homes in North San Luis Obispo County; we have none to show in the Salinas Valley yet. To judge the drawings, see our portfolio or our sheet-by-sheet permit set guide. State law (Business and Professions Code 5537) allows a building designer to prepare plans for wood-frame dwellings of two stories or less plus a basement, which covers ADUs, garage conversions and most single-family homes; a licensed engineer designs and stamps the structure, and we bring in a surveyor, arborist or other consultant when the lot calls for one.
Salinas Valley ADU questions
Does a remodel in Grover Beach need the full major permit checklist?
Only some do. The City’s Major Building Permit Checklist covers additions and alterations that involve structural changes. A remodel that moves bearing walls, changes beams or adds area falls under it; a cosmetic kitchen or bath update without structural work usually does not.
When does a Grover Beach remodel need a soils report?
The checklist requires a geotechnical soils report for additions over 500 square feet and for new structures.
Do the objective design standards apply to a remodel?
They apply to additions over 500 square feet. If the remodel adds an upper floor, the 80 percent upper-floor rule and the facade articulation items come into play.
How long is plan check?
The checklist lists 20 business days for the first check and 15 business days for later rounds.
Do I need a coastal permit to remodel?
West of Highway 1, any project in the coastal zone needs a coastal development permit. East of Highway 1, additions on single-unit lots in the coastal zone go through an administrative coastal permit; interior-only work usually does not.
Related: ADU plans in Salinas, design and drafting in Salinas, ADU plans in unincorporated Monterey County, garage conversion plans in Monterey County, the Monterey County hub and all the areas we serve.
Ready to start the ADU?
We design with real construction costs in mind, and our sister company Harrod Built can give you costing as the design comes together and build it when your the Salinas Valley plans are approved. Same family, same office.
Get a design quote in the Salinas Valley
Call 805-712-8993 or use the form. It helps to include the city, the address or parcel number, the lot size, whether you want a city pre-approved plan or a custom unit, and any garage you want to convert. Our contact page lists other ways to reach us.
Sources for this page: the City of Gonzales ADU page; the City of Soledad ADU page and ADU handbook; the City of Greenfield ADU page; the City of King City ADU flyer and Municipal Code Chapter 17.47; and the County of Monterey ADU page (checked October 23, 2026). Each city’s rules change, so we confirm with the city for every parcel before design.