Pre-Approved ADU Plans in California

How the state’s pre-approved ADU plan programs work, and the site-specific drawings you still need for your lot.

As of January 1, 2025, every California city and county has had to run a program that preapproves ADU plans (Gov. Code 65852.27). Using one can cut design time and shortens the review clock to 30 days. But a pre-approved plan is a building, not a permit for your lot. Here is how the programs work and what still has to be drawn.

What the law requires of each city and county

  • Accept ADU plans for preapproval, from anyone
  • Review them against the state ADU standards in Gov. Code 66314 and the sections after it
  • Post preapproved plans on its website, with the applicant’s contact information
  • Optionally adopt its own plans, or plans preapproved by other California agencies
  • Approve or deny a complete detached ADU application within 30 days when it uses a preapproved plan from the current building code cycle, or a plan identical to one it already approved in that cycle

What a pre-approved plan does not cover

  • Your site plan. Property lines, setbacks, easements, the unit’s location and utility routes are unique to your parcel.
  • Utilities. Water and sewer will-serve letters, or septic approval and a recent percolation test on septic lots.
  • Foundation and slope. Hillside lots, expansive soils or a soils report can change the foundation sheet.
  • Fire hazard zones. Ember-resistant vents, ignition-resistant materials and defensible space notes.
  • Coastal zone, grading and trees. Local permits that sit outside the building plans.
  • Energy. Title 24 compliance for your climate zone and orientation.

Central Coast examples

San Luis Obispo County publishes pre-reviewed ADU plans; see our guide to SLO County pre-reviewed ADU plans. Several Salinas Valley cities offer free plan sets (see Salinas Valley ADU plans), and Seaside offers City plans through a liability waiver (Seaside ADU plans). For any other city, look on its planning or building page for “preapproved ADU” or ask the counter; the law requires the list to be online.

How we help

  • Check whether a pre-approved plan fits your lot, setbacks and utilities
  • Draw the site plan, utility plan and any site-specific sheets
  • Adapt the foundation, fire zone and energy details where allowed
  • Or design a custom ADU when a stock plan doesn’t fit
  • Submit and answer plan check comments

For the full state rules see ADU plans in California. Local guides: ADU plans (SLO County), SLO County pre-reviewed ADU plans, Paso Robles, San Luis Obispo, Atascadero, Monterey County, Santa Barbara County, garage conversions in Paso Robles, what’s in a permit set.

Who draws the plans

Harrod Drafting & Design is a Paso Robles drafting and design office. The plan sets on our portfolio are homes in North San Luis Obispo County; we have none to show in California yet. To judge the drawings, see our portfolio or our sheet-by-sheet permit set guide. State law (Business and Professions Code 5537) allows a building designer to prepare plans for wood-frame dwellings of two stories or less plus a basement, which covers ADUs, garage conversions and most single-family homes; a licensed engineer designs and stamps the structure, and we bring in a surveyor, arborist or other consultant when the lot calls for one.

Questions

Does every California city have pre-approved ADU plans?

State law required every city and county to set up a program to preapprove ADU plans by January 1, 2025 (Gov. Code 65852.27). Some agencies have their own plan sets; others list plans submitted by designers or adopted from other agencies.

How fast is a permit with a pre-approved ADU plan?

The agency must approve or deny a complete detached ADU application within 30 days if it uses a plan preapproved in the current building code cycle, or a plan identical to one it already approved in that cycle (Gov. Code 65852.27). A standard ADU application has 60 days.

Is a pre-approved plan permit-ready for my lot?

Not by itself. You still need a site plan for your parcel, utility connections, a foundation that suits your soils and slope, and any fire zone, septic, coastal or grading items your lot triggers. That site-specific work is what we draw.

Can a designer submit a plan for preapproval?

Yes. The agency cannot restrict who submits plans for preapproval, and approved plans are posted on its website with the applicant’s contact information.

Is a pre-approved plan always the right choice?

It saves design time and review time. A custom ADU can fit an odd lot, a view, a slope or the style of your house better. We can tell you which path fits your parcel.

Sources: Gov. Code 65852.27, Gov. Code 66314, Gov. Code 66317; HCD ADU page and ADU Handbook (updated March 2026).

State law checked October 26, 2026 against the California Legislative Information site. Local rules change; we confirm your city or county’s current ordinance before drawing.

Ready to start the ADU?

We design with real construction costs in mind, and our sister company Harrod Built can give you costing as the design comes together and build it when your California plans are approved. Same family, same office.

Get a design quote in California

Call 805-712-8993 or use the form. It helps to include the address or parcel number, the city or county, the pre-approved plan you are looking at (if any), whether the lot is on sewer or septic, and the unit size you want. Our contact page lists other ways to reach us.