Permit-ready house plans & ADU design · SLO, Monterey & Santa Barbara CountiesCall 805-712-8993Request a design quote
Family room with a stone fireplace wall in a finished home designed by Harrod Drafting & Design

Home Design & Drafting in Pacific Grove

Remodels, additions, ADUs and new homes for Pacific Grove’s older neighborhoods, drawn around the City’s planning, historic and coastal rules.

Pacific Grove has a lot of older houses on small lots, a long list of historic resources and a certified coastal program, and the City looks closely at exterior changes. Our job is to draw the plans so they answer those questions up front: how much floor area and coverage the lot allows, whether the house needs a historic screening, which trees are protected and where the water comes from.

What we can draw for your Pacific Grove home

  • Window, siding and porch changes and additions, including the planning permit drawings the City asks for before a building permit.
  • Backyard cottages, attached units and garage conversions as ADU plans, checked against the City’s ADU ordinance before you invest in full drawings.
  • New homes and demolition-and-rebuild projects, with floor area, building coverage and site coverage worked out sheet by sheet.
  • Full construction sets with structural engineering coordination and Title 24 energy compliance.

Planning permit first, building permit second

The City’s planning FAQ is direct about it: any change to the exterior of a building needs a planning permit, including window changes, siding, roofing material and even changes to paving coverage. Interior work, such as a kitchen or bath remodel, does not, but almost every project needs a building permit, and the planning permit should be in hand before you apply for it. Window changes have their own Residential Window Guidelines, with different rules for historic and non-historic homes.

The Planning Division reviews all new construction and alterations and may refer a project to the Zoning Administrator, the City’s design review board (ARB), the Historic Resources Committee or the Planning Commission. The City’s permit paths bulletin shows how that splits: smaller design changes can be decided by staff with a mailed notice to neighbors, while new construction and major alterations go to the ARB. Planning applications are emailed to the Division, and the City recommends talking with a planner early and with your neighbors before you submit.

According to the FAQ, planners can take up to 30 days to review a submittal. If the project can’t be approved at staff level, the public hearing process may add another 30 to 90 days. We build that into the schedule we talk through with you.

Floor area, coverage and height

The City’s floor area vs. coverage bulletin explains three separate limits. Gross floor area counts enclosed space over 120 sq ft and carports, measured to the outside of the walls, and rooms with an interior height over 16 ft count twice. Building coverage in the R-1 zone is 45 percent for sites of 4,000 sq ft or less and 40 percent for larger sites. Site coverage, which adds patios, paving, decomposed granite and similar hardscape, is capped at 60 percent, or 15 percent in the Asilomar Dunes neighborhood, with up to 400 sq ft of driveway left out of the count. If required covered parking isn’t provided, the allowed floor area drops by the same amount.

The FAQ also lists R-1 setbacks of 15 ft in front, 10 ft in the rear and 10 percent of the site width on the sides, and a 25 ft, two-story height limit in R-1. We run these numbers on the first site plan, because on a small Pacific Grove lot they usually decide the design.

Historic screening for older houses

Pacific Grove keeps a Historic Resources Inventory of more than 1,350 structures, governed by Municipal Code Chapter 23.76. The FAQ says that if your house is over 50 years old, an Initial Historic Screening is most likely required before you submit, and a home on the inventory may need a historic consultant. Changes to historic resources must follow the Secretary of the Interior’s Standards. We find out where your house stands before we draw the exterior.

Coastal zone, trees and water

The City’s Local Coastal Program was certified by the Coastal Commission on March 11, 2020. Per the City’s coastal zone bulletin, work that counts as development there needs a Coastal Development Permit, with the Planning Commission as the review authority, while interior improvements that don’t intensify the use and in-kind repairs are generally exempt. Staff decides at submittal whether a project is exempt, and the Asilomar Dunes area has extra habitat rules.

Trees matter here too. The tree permit rules cover Monterey pine, Monterey cypress, coast live oak, shore pine and Torrey pine 6 inches or more in diameter, Gowen cypress of any size, other private trees 12 inches or more, and every tree within 100 yards of a monarch butterfly sanctuary. For water, the City points owners to the Monterey Peninsula Water Management District and its own water credit program, and warns that a state utilities commission moratorium may limit Cal-Am’s ability to set new meters for projects without an active meter. The FAQ notes a home with one bathroom may qualify to add a second under the District’s rules.

ADUs in Pacific Grove

The City’s ADU page lays out four steps: review the ADU ordinance, prepare the plan package, submit it to the Building Division, then build and inspect. It offers a free consultation with a City planner, for which you bring a rough site plan showing the lot, the house and the proposed ADU, and it says inaccurate or incomplete plans will not be processed. It also asks owners to confirm water with the Water Management District before going further. We can prepare that early site plan and then the full ADU set. Our Pacific Grove ADU guide covers the City’s size and height limits, historic homes, the coastal zone, water credits and trees.

See how we draw

Every plan set in our portfolio is a North San Luis Obispo County home; we don’t have Pacific Grove projects to show yet. The Modern French Country home in Templeton pairs the permit sheets with photos of the finished house, which is the clearest way to see what you would get.

Neighboring guides: Monterey, Pebble Beach, Carmel-by-the-Sea (and our Carmel-by-the-Sea new home guide) and the Monterey County page. Thinking about a backyard unit? ADU vs. junior ADU explains the difference.

Steps for a Pacific Grove project

  1. Lot check. Zoning, coverage, setbacks, historic status, coastal zone and trees, from your address.
  2. Concept. A layout that fits the floor area and coverage numbers, reviewed with you in 3D.
  3. Planning set. Drawings for staff, ARB or historic review, revised as the City comments.
  4. Building set. Construction drawings with engineering and energy compliance for the Building Division.

Reworking an older house? See whole-home remodel plans in Pacific Grove.

Pacific Grove FAQ

Do I need a permit to change windows in Pacific Grove?

Yes. The City requires a permit for all window changes and has Residential Window Guidelines with separate rules for historic and non-historic homes.

My house is over 50 years old. What does that mean?

The City says an Initial Historic Screening is most likely required before you submit a project. If the house is on the Historic Resources Inventory, more review and a historic consultant may be needed.

How much of my lot can I cover?

In R-1, building coverage is 45 percent for sites of 4,000 sq ft or less and 40 percent above that. Total site coverage, including hardscape, is capped at 60 percent, or 15 percent in Asilomar Dunes.

Do I need a planning permit for a kitchen remodel?

Not for interior-only work, according to the City’s FAQ, but you will still need a building permit for most remodels.

Can I build an ADU if I have no spare water?

Talk to the Monterey Peninsula Water Management District first. The City also runs a water credit sale program, and new Cal-Am meters may be limited by a state moratorium.

From approved plans to a finished home

Harrod Built (CSLB #986950), our construction company, serves Pacific Grove, so your plans can go straight to a builder who already knows them. Visit Harrod Built in Pacific Grove.

Planning a new house or a rebuild? Our guide to custom home design in Pacific Grove covers coverage and floor area math, design review, historic screening, trees and water for a new home.

Start your Pacific Grove plans

Give us a call at 805-712-8993, or send the form with your address, the work you have in mind and photos of the house.











    We summarized these rules from the City of Pacific Grove and Monterey Peninsula Water Management District pages linked above (checked October 6, 2026). Confirm current requirements with the City’s Planning and Building divisions before you design.

    Adding on to a Pacific Grove home? See addition plans in Pacific Grove.