Home Design & Drafting in Buellton, CA
ADUs, additions, remodels and new homes for Buellton, set up for City Planning first and County building plan check second.
Buellton splits the permit job in two. The City’s Planning Department handles zoning, design and land use, while the City contracts with Santa Barbara County’s Building and Safety Division for building plan check, permit issuance and inspections. We prepare drawings for both offices, so a Buellton remodel, ADU or new home moves from one to the other without being redrawn.
Buellton work we take on
- Accessory dwelling units: detached cottages, attached units, junior ADUs and garage conversions, including site plans for the City’s own pre-designed ADU plans.
- Home additions and remodels drawn so the Planning set and the County building set match sheet for sheet.
- Custom homes on Buellton lots, laid out around setbacks, native trees, drainage and the City’s lighting rules.
- Construction documents with a licensed structural engineer and Title 24 energy calculations included.
Step one: Land Use Exemption or Zoning Clearance from the City
The City calls its Planning Department “your first stop.” Its Land Use Exemption and Zoning Clearance checklist (updated July 2025, under Municipal Code sections 19.02.030(B) and 19.08.100) says the County will not formally accept a building permit application until the project has one of those two City approvals. Plans can be emailed as PDFs, and electronic sets must be fully dimensioned. The City allows up to 30 days from submittal to decide whether the application is complete.
The checklist reads like a drawing list. The site plan shows setbacks, adjacent streets and easements, any watercourse and its top of bank, buildings on the neighboring parcels and anything being demolished. Elevations show every side, the maximum height measured from average finished grade, and exterior materials and colors. Schematic floor plans give the square footage of each habitable room. Depending on the project, Planning may also ask for a landscape plan that maps existing trees with trunks over 3 inches, an outdoor lighting plan, a can-and-will-serve letter for City water and wastewater, and a soils report, which the checklist says is required for most new construction and addition projects.
Step two: the building permit through Santa Barbara County
With the City’s approval in hand, the building permit is filed with the County’s North County office through the County’s online permit portal, the same Accela system the County uses for its unincorporated areas. Grading, encroachment and public improvement plans are separate: the City’s Public Works Department contracts with an outside engineering firm for those permits and inspections. We keep one set of base drawings behind all three reviews, so a change made for Planning shows up on the building and grading sheets too.
Outdoor lighting is part of the design
Buellton’s outdoor lighting section (Municipal Code 19.04.130) applies to new and replaced exterior lights on homes, including entry, landscape and security lighting. Fixtures must point down and be fully shielded, bulbs must be LED or similar, and color temperature is capped at 3000 Kelvin. Closer to sensitive areas the cap drops to 2700 Kelvin: within 100 feet of the open space zone, within 50 feet of a creek’s top of bank, or within 200 feet of the Santa Ynez River’s top of bank. We put fixture locations and a lighting schedule on the plans, so Planning can see compliance at a glance.
Buellton ADU rules
ADUs are covered by Municipal Code section 19.06.180 and summarized in the City’s ADU brochure. They are approved ministerially in the RS, RM and PRD residential zones. Size caps are 1,200 sq ft for a new detached ADU, 850 sq ft for an attached ADU with one bedroom or less, 1,000 sq ft for two or more bedrooms, and 500 sq ft for a junior ADU. The general height limit is 25 feet, but a detached ADU built alongside an attached ADU or a junior ADU is limited to 18 feet.
New ADUs need 4-foot side and rear setbacks; the brochure warns that building code fire-separation rules apply when a wall sits closer than 5 feet to a property line. Exterior materials, colors and roof slope should match the main house, and for a detached ADU over 800 sq ft that match is required. The code also bars removing a protected native tree for an ADU unless the native tree ordinance is followed, and it does not require replacement parking when a garage is converted. The ADU still gets its Zoning Clearance from the City and its building permit from the County.
The City’s pre-designed ADU plans
Buellton offers three pre-designed ADU plans free to homeowners: a 745 sq ft one-bedroom with a den that can become a second bedroom, a 1,022 sq ft two-bedroom, each in a Mission Revival or Ranch exterior, and a conversion plan for an attached or detached garage. The City says they were pre-approved by City Planning, Public Works and County Building and Safety, are meant to be used as designed with limited changes, and still need property-specific information from each applicant. Title 24 calculations come with the two detached plans but must be done separately for the garage conversion. That leaves the site plan, utility routing and, for a garage, the energy compliance work, all of which we can prepare.
Specific plans and fire review
Some Buellton parcels sit inside a specific plan, such as the Avenue of Flags Specific Plan (amended May 2025) or the Village Specific Plan (amended March 2013), and the City also maintains Community Design Guidelines (2026 edition). We check which documents apply to your lot before design starts. Fire review comes from the Santa Barbara County Fire Department, which the City’s ADU brochure lists as the contact for fire requirements.
Our plan sets and nearby guides
We work from Paso Robles, and the projects in our portfolio are North County San Luis Obispo homes, not Buellton houses. The Modern French Country home in Templeton shows a full plan set beside the finished house Harrod Built built from it; the rest of the portfolio shows our sheet detail.
More Santa Ynez Valley and Lompoc Valley guides: Solvang, Santa Ynez and Los Olivos, Lompoc, Orcutt and the Santa Barbara County overview. For any project, see what is in a permit set and ADU vs. junior ADU.
Our process for Buellton homes
- Address and goals. Send the address, photos and what you want to add. We look up the zone, any specific plan and nearby creeks or open space.
- Planning drawings. Site plan, elevations, schematic floor plans and lighting, sized for the Land Use Exemption or Zoning Clearance.
- Building set. Structural and energy work added for County plan check, with grading sheets for Public Works if needed.
- Corrections. We answer City and County comments and resubmit until the permit is ready to issue.
Adding a unit inside city limits? Buellton has its own ADU ordinance and a Zoning Clearance step before the County building permit. See ADU plans in Buellton.
Buellton FAQ
Who issues building permits in Buellton?
Santa Barbara County’s Building and Safety Division, under contract with the City. The County will not accept the application until City Planning has issued a Land Use Exemption or Zoning Clearance.
How big can a detached ADU be in Buellton?
Up to 1,200 sq ft, and up to 25 feet tall, or 18 feet when it is combined with an attached ADU or junior ADU on the same lot.
Can I change the City’s pre-designed ADU plans?
Only a little. The City says the plans are meant to be used as designed with limited modifications. Larger changes mean a custom design, which we can draw.
Does my exterior lighting need to be on the plans?
For many projects, yes. Planning’s checklist lists a site lighting plan, and Code 19.04.130 requires shielded, downward LED fixtures at 3000 Kelvin or less, lower near creeks, the river and open space.
Will Planning need a soils report?
Often. The City’s checklist says a soils report is required for most new construction and addition projects.
When it is time to build
Our construction company, Harrod Built (CSLB #986950), also serves Buellton, so the same family can carry your approved plans into construction. Read about Harrod Built in Buellton.
Ask about your Buellton plans
Call 805-712-8993 or use the form below. Include the address, the project and any surveys or old drawings you have.
Rules on this page are summarized from City of Buellton Planning Department documents and Municipal Code sections linked above, checked October 6, 2026. Requirements change, so confirm with the City and the County before you design.