Permit-ready house plans & ADU design · SLO, Monterey & Santa Barbara CountiesCall 805-712-8993Request a design quote
Custom home exterior with gravel landscaping and walkway at dusk

ADU Plans in Grover Beach, CA

Custom ADUs, junior ADUs, conversions, and the site plan the City’s pre-designed ADUs still need.

Short answer: Grover Beach approves ADUs that meet its building code and objective design standards through a ministerial building permit, with no design review hearing, except in the Coastal Zone. The City says it averages 20 business days to review a complete ADU application. Detached and attached ADUs can be up to 850 sq ft for a studio or one-bedroom and 1,200 sq ft for two or more bedrooms, and junior ADUs up to 500. You can design a custom unit or use one of six pre-designed plans, which still need a site plan and a stamped grading and drainage plan for your lot. Call 805-712-8993.

Grover Beach’s ADU rules at a glance

From the City’s ADU page and objective design standards checklist for ADUs:

  • Size: 850 sq ft for a studio or one-bedroom ADU, up to 1,200 sq ft with two or more bedrooms. An attached ADU is also capped at 50% of the existing home. Junior ADUs up to 500 sq ft.
  • Height: detached ADUs 16 ft in most cases. Attached ADUs up to 25 ft and two stories; the parts over 16 ft have to meet the zone’s normal setbacks.
  • Interior ADUs: converting part of a legal structure can add up to 150 sq ft, but only to make room for getting in and out.
  • Units on a single-family lot: one junior ADU, one interior or attached ADU, and one detached ADU, up to four units total.
  • Junior ADUs: the owner has to live on the property.
  • Entries: every ADU needs its own exterior door. On an interior lot, an ADU that faces the street needs its entrance toward the street, with a porch at least 5 by 8 ft or a defined portico, recess or stoop at least 4 by 4 ft.
  • Rentals: no short-term rentals.

The Coastal Zone: check this first

Part of Grover Beach is in the Coastal Zone. When a Coastal Development Permit is needed, you finish that planning approval before you can submit the building permit. The City’s ADU page lays it out:

  • East of Highway 1, a new attached or detached ADU (or any new structure or addition) needs an Administrative Coastal Development Permit.
  • West of Highway 1, any project needs a Coastal Development Permit.

So the first thing we check on a Grover Beach lot is which side of Highway 1 it sits on and whether it’s inside the Coastal Zone line. That decides your schedule more than anything on the plans.

Using the City’s pre-designed ADU plans

Grover Beach, Arroyo Grande, Atascadero and Morro Bay built a shared set of pre-designed ADU plans for new detached units: Efficiency, Studio, One Bed, One Bed+, One Bed + Loft and Two Bed+, from a 316 sq ft studio to a 1,007 sq ft two-bedroom, in four exterior styles (California Modern, Backyard Craftsman, Beach Bungalow and Coastal Ranch). The plans can’t be changed. A custom ADU goes through the City’s major permit checklist instead. The City also accepts ADU plans pre-approved by other agencies.

Per the Pre-Reviewed ADU Permit Checklist (updated April 2025), you apply on the City’s Citizen’s Portal (no paper) with:

  • the fillable stock-plan sheets G0.0 and G0.1, with your options checked,
  • a site plan with north arrow and scale, property lines, existing structures, street names and widths, drainage facilities, utility lines and connections, wall and fence heights, parking and landscaped areas,
  • a grading and drainage plan stamped and signed by a licensed professional, with topography tied to NAD 83, cut and fill amounts, drainage basins sized for on-site retention under Development Code 5.50.080.C, and grades within 10 ft of the property line,
  • a stormwater control plan if the project adds impervious surface, and
  • your contractor on the application (they need a Grover Beach Business Tax Certificate), or an owner-builder form.

The checklist lists 10 business days for the first review and 10 for each resubmittal. The site plan and the lot-specific sheets are the part we prepare. If none of the six plans fits your lot, budget or family, we design a custom ADU instead. The pre-designed plans also need at least 4 ft from the side and rear property lines.

Older unpermitted units

If a unit on your property was built before January 1, 2020 without a permit, the City has a streamlined legalization path under AB 2533 that checks it against state health and safety standards. We can draw the as-built plans for that. See legalizing unpermitted work and as-built plans.

How it works

  1. Send your address and what you’d like to build.
  2. We check the Coastal Zone line, size, height, setbacks and unit count for your lot.
  3. Design a custom ADU, or pick a pre-designed plan, with 3D views.
  4. Permit set with site plan, load calculation and Title 24 for the Citizen’s Portal.
  5. Build. Our sister company Harrod Built can give you costing during design and build it when you’re ready.

Grover Beach ADU FAQ

How long does Grover Beach take to review an ADU?

The City says it averages 20 business days for a complete ADU application and 15 for resubmittals, ahead of the 60 days state law allows. The pre-reviewed ADU checklist lists 10 business days per review. A Coastal Development Permit, when needed, comes first.

How big can an ADU be in Grover Beach?

850 sq ft for a studio or one-bedroom and up to 1,200 sq ft with two or more bedrooms. An attached ADU is also limited to 50% of the existing home, and a junior ADU to 500 sq ft.

How tall can a detached ADU be?

The City lists 16 ft for a detached ADU in most cases. Attached ADUs can reach 25 ft and two stories, with the parts above 16 ft meeting the zone’s setbacks.

Do I need a Coastal Development Permit for an ADU?

Only if the lot is in the Coastal Zone. East of Highway 1, new attached or detached ADUs need an Administrative Coastal Development Permit; west of Highway 1, any project needs a Coastal Development Permit. It has to be approved before the building permit is submitted.

Can I use a pre-designed plan without any other drawings?

No. You still submit a site plan and a grading and drainage plan stamped by a licensed professional, plus a stormwater control plan if you add impervious surface.

Can I change the pre-designed plan?

No. The City says design changes can’t be made under the pre-designed program. If you want a different size or layout, the ADU goes through the custom (major permit) route, which is what we draw.

More: residential drafting in Grover Beach, addition plans in Grover Beach, ADU plans, ADU plans in Arroyo Grande and ADU plans in Morro Bay (same regional plans), ADU plans in Oceano, ADU plans in Pismo Beach. Guides: ADU vs. junior ADU, what’s in a permit set, permit plans in San Luis Obispo County.

Ready to build?

We design with real construction costs in mind, and our sister company Harrod Built can give you costing as the design comes together and build it when your plans are approved. Same family, same office, no hand-off gap.

Request a quote for your Grover Beach ADU plans

Call 805-712-8993, send your address and a few details below, or use our contact page.











    Details on this page come from the City of Grover Beach pages and checklists linked above (checked October 9, 2026). Rules change, so confirm with the City before you design.