
Home Design & Drafting in Santa Maria
ADUs, additions and new homes for Santa Maria, drawn for the City’s Building Division.
Santa Maria sits just across the county line from San Luis Obispo County, an easy trip down Highway 101 from our Paso Robles office. We draw backyard ADUs, garage conversions, additions and new homes here for review by the City.
What we draw for Santa Maria homeowners
- Custom home design: New homes and rebuilds in Santa Maria, drawn to fit the lot and the local review steps.
- ADU plans: Detached and attached ADUs, junior ADUs and garage conversions, custom or alongside a pre-designed plan.
- Remodel and addition plans: Additions, second stories and remodels for existing homes.
- Drafting and permit sets: Site plans, floor plans, elevations, sections and 3D views for the City of Santa Maria, with structural engineering coordination and Title 24 energy compliance.
Permits in Santa Maria: City Building Division
Santa Maria is an incorporated city, so the City’s Building Division (Community Development, 110 S. Pine St., Suite 101) reviews your plans, not the County. The Division posts pre-approved ADU information and submission requirements alongside its building permit application. The County’s pre-approved ADU plans are for unincorporated areas only, so they don’t apply inside the city; Orcutt, just south, is unincorporated and does use the County’s process.
Santa Maria ADU rules
Santa Maria’s ADU rules are in Municipal Code Chapter 12-56. ADUs are approved ministerially, without a hearing, and the City must approve or deny a complete ADU application within 60 days. Side and rear setbacks are four feet, and no setback is needed when an ADU is built in the same place and to the same dimensions as an existing structure.
Under the standard path, an ADU can be up to 850 sq ft with a studio or one bedroom and up to 1,000 sq ft with two or more bedrooms. An attached ADU is also limited to half the floor area of the main house, and an ADU may not exceed 10 percent of the lot area, though none of those limits can force an ADU below 800 sq ft. A detached ADU on a single-family lot can be 18 ft tall, plus up to 2 ft more to match the roof pitch of the house, or 16 ft if the lot also has a junior ADU. A junior ADU needs a recorded covenant before the building permit is issued. The City rewrote this chapter in September 2026 (Ordinance 2026-08); ADU plans in Santa Maria covers what changed.
Harrod projects near Santa Maria
Our published plan sets are North San Luis Obispo County homes, including the Modern French Country home in Templeton, shown as plan sheets and as the finished home Harrod Built built from them. Browse the portfolio to see the level of detail we draw for Santa Maria projects.
Harrod Built also serves this area; see Harrod Built in Santa Maria and Orcutt. Nearby guides: Orcutt, Lompoc, Santa Ynez and Los Olivos, Solvang and Montecito, the Santa Barbara County guide and, just north, Nipomo and Arroyo Grande.
Guides that apply anywhere: what’s in a permit set, Title 24 energy rules for additions, ADU vs junior ADU and what drives the cost of permit plans.
How it works
- Call or send your Santa Maria address. We check zoning, overlays, setbacks and which agencies review your parcel.
- Design. Layout options and 3D views, revised with you until the plan fits your lot and budget.
- Permit set. We prepare the drawings for the City of Santa Maria, with structural engineering coordination and Title 24 energy compliance.
- Build. Our sister company Harrod Built can give you costing as the design comes together and build it when you’re ready.
Santa Maria FAQ
Who issues building permits in Santa Maria?
The City of Santa Maria Building Division, part of Community Development at 110 S. Pine St., Suite 101. Orcutt and other unincorporated areas nearby go through Santa Barbara County instead.
How big can an ADU be in Santa Maria?
Under the standard path, up to 850 sq ft for a studio or one bedroom and 1,000 sq ft for two or more bedrooms. Attached ADUs are also limited to half the main home’s floor area, but the City’s other limits can’t push an ADU below 800 sq ft.
How tall can a detached ADU be?
18 ft on a single-family lot, up to 20 ft if needed to match the main house’s roof pitch, or 16 ft if the lot also has a junior ADU.
How long does the City take to review an ADU?
The City must approve or deny a complete ADU application within 60 days of receiving it.
Can I use the County’s pre-approved ADU plans in Santa Maria?
No. They are for unincorporated Santa Barbara County. Check the City’s own pre-approved ADU information, or we can design a custom ADU.
Ready to build?
Every design is drawn with real construction costs in mind, and our sister company Harrod Built (CSLB #986950) can give you costing along the way and build it when your plans are approved. Same family, same office, no hand-off gap. See Harrod Built in Santa Maria.
Request a design quote for your Santa Maria project
Call 805-712-8993 or send your address and a few details below.
Permit, water and fire details on this page come from the official websites linked above (checked October 6, 2026). Rules change, so confirm with the City of Santa Maria before you design.